Alere

Alere

Location

San Diego

Owner

BioSite, Inc.

Architect

Delawie

Square Footage

352,750

Awards

Tilt-Up Building Award, American Concrete Institute

Biosite, now Alere had Reno build their life science corporate campus consisting of four-buildings, site infrastructure and off-site improvements. The project's scope included two 2-story and two 3-story structural steel and concrete tilt-up panel shell buildings. The campus contains all of the company’s facilities, including FDA-validated medical device manufacturing. The complete interior build-out included:

  • Office space in Building A
  • R&D laboratory space with a vivarium in Building B
  • Manufacturing space in Building C
  • High-pile automated product storage warehouse space in Building D